I’m so near being completed with our bed room. I’ve only a few extra gadgets to test off of my checklist earlier than it’s completed, and I’ve reached that time of the undertaking the place it looks like an enormous lull as a result of whereas I’m persevering with to work on these initiatives every day, I don’t actually have thrilling progress to share with you every day. So that is the purpose of the undertaking the place I begin to get questions like, “Wait. Did I miss the bed room reveal? Are you completed?”
No, you didn’t miss something. It’s so shut, nevertheless it’s not fairly there. Listed below are the gadgets I nonetheless have on my “to do” checklist for the bed room.
First, I nonetheless must hem all 4 material panels. All 4 panels are sewn and hanging, however they give the impression of being actually sloppy proper now as a result of they’re not hemmed, and I nonetheless want to connect the returns to the wall.

I typically simply make all of my material panels for a window or a room to at least one particular size after which grasp them, however as a result of the flooring on this explicit room are essentially the most unlevel flooring in our complete home, I’ve determined that the hem in every panel must be pinned whereas hanging in order that they give the impression of being proper for that exact space within the room. If I sewed these all to the identical size, some would look proper whereas others would look too lengthy or too quick. *Sigh* If for no different cause, I’ll be so glad to be completed with this room in order that I don’t should work with these unlevel flooring anymore. As soon as every part is completed, I don’t suppose the unlevel flooring will probably be apparent, however they’ve positive made this undertaking, from the trim to the draperies, a lot tougher.
The opposite very apparent undertaking that I nonetheless must do is to cowl up the attic entry.


That is a type of initiatives that I’ve dragged my toes on as a result of I simply dread it. I do not know why, although. It would actually require me to connect three items of trim. That’s it. Simply three items of trim. It would in all probability take me all of 1 hour to get this utterly completed, and that features the caulking and portray. And but, I’ve put it off this lengthy. I don’t know why there are initiatives that I dread a lot even after I know they’ll be tremendous easy to complete.
After which I want to color my little facet desk. I attempted a wood-look end, nevertheless it’s nonetheless very apparent to me that it’s a steel desk, in order that gained’t do. I’m going to color it gold and be completed with it.


That’s a easy sufficient undertaking, however I actually ought to have completed that earlier than the climate turned. So now I simply have to attend for it to heat up sufficient in order that I can get exterior and paint. I hope to do this tomorrow. It’s speculated to be within the 60s throughout the afternoon tomorrow, so I can’t miss that window of alternative.
And the ultimate massive undertaking (that isn’t actually tough) is that I need to make a cover cowl out of the chook material. I have already got the 2 massive pillows that my mother made for me out of the chook material…


However from the start, I’ve wished the chook material to be featured extra prominently within the room. I’ve been ready to see how the room would form as much as make my closing determination on simply how I wished to make use of the remainder of the material. Initially, I assumed I would reupholster that second bench from the breakfast room with the chook material and put that bench on the foot of the mattress. However now that we’ve been dwelling on this room for a few weeks, I’ve determined that I don’t need or want one other piece of furnishings in right here.
Then I thought-about making a easy throw or small quilt with the additional material. However after giving it a bit of extra thought, I lastly determined to simply make a cover cowl out of it. And since I would like it to match the pillows — chook material with inexperienced trim — I needed to order extra inexperienced material to trim out the cover cowl. I’ve every part I want for that now, so I’m hoping to get that completed within the subsequent few days. This will probably be my first time to make cover cowl, however I can’t think about that it’s tough.
After which I’ve simply a few random ending touches, like portray the outlet covers (that are all nonetheless striped from the house gymnasium days) and including a chunk of trim in entrance of the door to cowl up the random reduce edges of the hardwood flooring that didn’t get coated when the door was put in. These issues are all very fast and easy.
So right here’s what my closing punch checklist seems to be like:
- Hem the material panels and fix the returns to the partitions;
- Trim out the attic entry;
- Paint the facet desk;
- Make a cover cowl;
- Paint the outlet covers;
- Add trim by the door.
So the checklist is dwindling, and it’s virtually there! I don’t know that I’ll meet my objective of ending by the tip of this month (I blame that on getting sick and being out of fee for about 4 days), however I’ll be very shut! If every part goes as deliberate, I consider I’ll have this undertaking wrapped up by the start or center of subsequent week. After which, on to the studio rest room!
Extra About Our Grasp Bed room
see all grasp
bed room diy initiatives
learn all grasp
bed room weblog posts




